An interesting look at an alternative to Nuclear Power. The Electric Utilities always go for bigger is better. Why is this a good idea? From Will Collier writing at Pajamas Media:
When It Comes to Nuclear Power, Companies Should Think Small
A few months ago, the Nuclear Regulatory Commission granted permission for initial site work to begin on new nuclear reactors in the United States for the first time since the 1970s. Georgia Power, a subsidiary of the gigantic Southern Company, plans to build the two new reactors at its Vogtle nuclear plant, near Augusta.

At first glance, I was all in favor of new nuclear construction. Among other reasons, it�s high time we stopped determining energy policy on the basis of a bad Jane Fonda movie. But as a Georgia Power customer � who�s already on the hook for part of the bill for the new facilities � I�m scratching my head a bit over both that price tag, and over the rationale for going back to the old model of massive, complex, and hugely expensive power plants.

The planned Votgle upgrade is estimated to cost around $14 billion, and each reactor will produce around 1250 megawatts of electricity (MWe). The new reactors will be added to two existing units which were completed during the 1980s.

The cost of those two original units, estimated at the time to be around $660 million, skyrocketed to nearly $9 billion in the wake of the post-Three Mile Island regulatory blizzard. That jump in costs, which was typical for the industry, effectively ended new nuclear plant construction for a generation.
The alternative and some numbers:
Take for instance the Hyperion Power Module, or HMP. Developed at, and then spun off from, the Los Alamos National Laboratory, Hyperion is marketing the diametric opposite of the power companies� massive and complex facilities. Hyperion�s reactor is a relatively tiny device, about the size of a dinky Smart Car.

Unlike large-scale plants requiring 24/7 monitoring by a small army of engineers and technicians, an HPM contains no moving parts, and is intended to operate for years with no human interaction to speak of. Hyperion reactors are actually intended to be buried underground during their service lives, with no hands-on maintenance at all between refueling cycles, which occur every 7-10 years.

Of course, a single Hyperion unit is hardly the equivalent of a Westinghouse AP1000 reactor, two of which are planned for the Votgle facility. One HPM generates only 25 MWe, while a massive AP1000 churns out an appropriately massive 1250 MWe or so.

But nobody ever said you have to buy just one. If we assume that a single new AP1000 costs about $7 billion for 1250 MWe (which is not entirely fair as �sticker prices� go, since the $14 billion estimate for the Votgle plant upgrade includes financing costs as well as actual production), that works out to about $5.6 million per MWe.

A single HPM currently lists for $50 million (and I should note here that this is already twice the price Hyperion promised in its initial 2008 press releases). At 25 MWe per unit, we�re looking at $2 million per MWe, a little more than a third of the unit price of power from an AP1000.

Hyperion says its reactors aren�t intended to replace large-scale generation plants, but the engineer in me wonders, why not? HPMs are built on an assembly line, and Hyperion already has over 100 orders for them. Picking up my calculator again, I figure that in order to equal the output of one AP1000 reactor, I�d need to buy 50 HPMs.

At $50 million per unit (how about a bulk discount?), that would cost $2.5 billion. Now, I don�t have that kind of cash laying around myself, but you don�t need to be an accountant to see that $2.5 billion is a lot less than $7 billion. And that doesn�t count the untold millions I�d have to spend on the aforementioned army of maintainers for the AP1000 � although either way, you�d need a sizable team of regular power plant workers to maintain the actual power turbines.
The other thing to look at is these could be distributed over a wide area. This would eliminate the need for a lot of the grid inter-ties. Hospitals and Medical Centers could have their own electrical source. Factories. Cities. Makes a lot of sense... Also to consider is that the Pressurized Boiling Water Reactor (PBWR) design is basically about 60 years old and it still has the waste problem. Newer designs using Thorium have a great safety record, are very efficient and can recycle much of their own waste back into fuel. The remaining waste only needs about 300 years of storage.

Leave a comment

October 2022

Sun Mon Tue Wed Thu Fri Sat
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          

Environment and Climate
AccuWeather
Cliff Mass Weather Blog
Climate Depot
Ice Age Now
ICECAP
Jennifer Marohasy
Solar Cycle 24
Space Weather
Watts Up With That?


Science and Medicine
Junk Science
Life in the Fast Lane
Luboš Motl
Medgadget
Next Big Future
PhysOrg.com


Geek Stuff
Ars Technica
Boing Boing
Don Lancaster's Guru's Lair
Evil Mad Scientist Laboratories
FAIL Blog
Hack a Day
Kevin Kelly - Cool Tools
Neatorama
Slashdot: News for nerds
The Register
The Daily WTF


Comics
Achewood
The Argyle Sweater
Chip Bok
Broadside Cartoons
Day by Day
Dilbert
Medium Large
Michael Ramirez
Prickly City
Tundra
User Friendly
Vexarr
What The Duck
Wondermark
xkcd


NO WAI! WTF?¿?¿
Awkward Family Photos
Cake Wrecks
Not Always Right
Sober in a Nightclub
You Drive What?


Business and Economics
The Austrian Economists
Carpe Diem
Coyote Blog


Photography and Art
Digital Photography Review
DIYPhotography
James Gurney
Joe McNally's Blog
PetaPixel
photo.net
Shorpy
Strobist
The Online Photographer


Blogrolling
A Western Heart
AMCGLTD.COM
American Digest
The AnarchAngel
Anti-Idiotarian Rottweiler
Babalu Blog
Belmont Club
Bayou Renaissance Man
Classical Values
Cobb
Cold Fury
David Limbaugh
Defense Technology
Doug Ross @ Journal
Grouchy Old Cripple
Instapundit
iowahawk
Irons in the Fire
James Lileks
Lowering the Bar
Maggie's Farm
Marginal Revolution
Michael J. Totten
Mostly Cajun
Neanderpundit
neo-neocon
Power Line
ProfessorBainbridge.com
Questions and Observations
Rachel Lucas
Roger L. Simon
Samizdata.net
Sense of Events
Sound Politics
The Strata-Sphere
The Smallest Minority
The Volokh Conspiracy
Tim Blair
Velociworld
Weasel Zippers
WILLisms.com
Wizbang


Gone but not Forgotten...
A Coyote at the Dog Show
Bad Eagle
Steven DenBeste
democrats give conservatives indigestion
Allah
BigPictureSmallOffice
Cox and Forkum
The Diplomad
Priorities & Frivolities
Gut Rumbles
Mean Mr. Mustard 2.0
MegaPundit
Masamune
Neptunus Lex
Other Side of Kim
Publicola
Ramblings' Journal
Sgt. Stryker
shining full plate and a good broadsword
A Physicist's Perspective
The Daily Demarche
Wayne's Online Newsletter

About this Entry

This page contains a single entry by DaveH published on January 31, 2010 12:57 PM.

Lech Walesa: �America Is Moving Toward Socialism� was the previous entry in this blog.

Running up quite the bar tab is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Monthly Archives

Pages

OpenID accepted here Learn more about OpenID
Powered by Movable Type 5.2.9