Surfing the web -- now that I am (still) at 65% download capacity, I should be getting the service I contracted for. I am not. The performance of the dish is a lot better but it is not what I used to have.
I have not called Speakeasy yet as I want to keep the phone line open in case the sheerer needs to call but as soon as he is done, I will be placing the order for the T-1